Digitize
your plant.
Paper out. Proof in. Every process on your floor, captured at the machine and held in one Console.
Every process is a module.
Measurements. Counts. Checklists. Each one a small app, built from the form that process already uses.
One Console locks them together.
Modules send data in. The Console sends limits, alarms and acknowledgements back. Nothing is ever overwritten.
One Console. Every process.
Overview
mission control · plant health · live 20sliveThree shapes of data.
We do not ask what industry you are in. We ask what your operators record. It is always some mix of these.
Measured values.
Diameter, weight, temperature, torque. Held against your limits on a control chart.
mm · g/m · °C · N·mCounted defects.
Scrap and rework by code, mould, tool or shift. A live Pareto and the cost of poor quality.
pcs · code · €Steps and checks.
Batch records, critical control points, start-up checklists. Signed by name.
step · hold min · sign-offBuilt from your form.
Send us the sheet your operators fill in today. We configure its fields, limits and roles in the Console. The next process is configuration, not a project.
Evidence, not entries.
Every value keeps who entered it, when, and on which device. Corrections are appended with a reason. Managers step up with a passkey to correct, never to erase.
Tech specs.
- Capture
- Tablet at the machine, offline-first.Entries are accepted with no network and sync when it returns.
- Analysis
- Control charts with Western Electric rules.Pareto by defect code. Overdue-step alarms. One alarm per event, acknowledged by name.
- Evidence
- Append-only record.Corrections require a reason. Manager writes sit behind a passkey step-up window.
- Devices
- Per-tablet enrolment.Each device is issued, listed and revocable from the Console.
- Integration
- Outbound-only ERP connector.OData V4. Microsoft Dynamics 365 Business Central first, on-premise friendly.
- Configuration
- Forms, limits, codes, steps and roles.Set in the Console. No bespoke software per plant.
- First deployment
- Elysee, Cyprus.Pipe extrusion, in production.
Start with one process.
One process, one tablet, one Console. Days, not quarters.